actor change

Arranging Times
speaking to lawrence about times he could be available for our film caused us many problems, the biggest one having to finish all filming before the deadline .He also coudnt get out of lessons and the frees he had within the day didnt match with our other main actor Josh Dobson.
later discussing this issue i offerd to take the place and play his role.
Thursday (5.11.09)
: Office scene
in M004
with extras
Wednesday (11.11.09)
: lift scenes T.k maxx
7.am _ 9.am out of working hours

Wednesday, 4 November 2009

Contacted T.k Maxx about the lift arrangements


We contacted T.K maxx department store in Rawmarsh Parkgate

to ask permission of using their lift out of working hours time
we talked to the duty manager and she gave us the advice to ring back the following day which will be the 5.11.09 sometime after 7.AM in where we will discuss the matter with the store manager.



Here is the number we researched for contatcting the shop

(using http://www.yell.com/)


















01709 780790

Friday, 23 October 2009

Wednesday, 21 October 2009

Tuesday, 20 October 2009

where we are

Continuing with our short film project prep work as a group we have stedilly made progress upto filming.

We have sucessfully

. decided what we are going to call our short film this being " the long lunch break"
. constructed production schedules to help keep on track
. took a series of images for a possible location inside college (lift)
. briefly decided on a potential poster idea getting feedback from class members
. researched a clip of a male trapped in a lift on youtube looking back at the cctv footage which we are thinking of including in a similar scene within our short film to add verisimilitude.
. completed story board and how the narrative will unwravel
. contacted a student within our college to ask about a place in our film (this being one of the main characters).


still working on

. finish story board and create a powerpoint slide or a google document presented to class for improvements
. complete call sheet and script
. letter of permission to a local retail manager to rent out a lift for film day
. arrrange holiday work


Tuesday, 13 October 2009

production schedule

Here is our plan of action. This table enables us to veiw our tragets and keep track of our progression throughout the week it also allows us to know what needs to be done before we start filming. At each final slot of the day we have put several other tasks, this is for out of college progression and to finish off aspects we missed in lesson.

Monday, 12 October 2009

images of potential filming locations.
















Here we have took examples of possible a location for our short film. Taking these we have used low and high angle shots inside the lift to see how much room we had for potential filming.
Being a disabled lift we relised to add verisimilitude to our short film that we would have to show a different lift enterance of some stereotypical office therefore clevely editing the two character entering the lift of a shop and then the actual filming inside the lift at college as it gives us privacy from shoppers e.t.c when filming.